Methods and systems for fracturing subterranean wells
Abstract
New methods and systems for subterranean fracturing for hydrocarbon wells. A plan of the fracture propagation and in-fracture proppant distribution is used with a real-time model of the status of the fracture dimensions and in-fracture proppant concentration to automatically control flow rates and properties of a fracturing fluid flow stream being used to induce and prop the fracture. Real-time measurements of the status of the fracture are made using surface and/or down-hole sensors. Real-time control over the flow rate and properties of a fracturing fluid flow stream are made by manipulating the fracturing fluid supply equipment. Real-time modifications of the fracturing model are made by comparing fracture sensor measurements of actual fracture dimensions to the predicted dimensions, and then adjusting the model for inaccuracies. Real-time updates to the fracturing plan are made by comparing actual fracture and propping results to desired results, and then adjusting to achieve optimal results.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 8 · Forward citations: 39.
Claims (3 — 2 Independent, 1 Dependent)
- Claim 1Independent Claim
A method for performing fracturing on a well, comprising the actions of: (a) fracturing, in accordance with a fracturing model and a fracturing plan, while monitoring inputs used to estimate fracturing progress; (b) automatically modifying said fracturing model from time to time, as said monitoring action indicates that said fracturing model may be inaccurate; and (c) automatically modifying said fracturing plan, in dependence on said action (b).
- Claim 2Depends on #1
The method of claim 1 wherein said fracturing plan is a time series of desired results for a subterranean fracturing process for a hydrocarbon well comprising: (i) target three-dimensional spatial coordinates defining the boundaries and interior space of a subterranean fracture, and (ii) the target volume of said fracture occupied by a proppant at said spatial coordinates.
- Claim 3Independent Claim
The method
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 39 total)
References Cited — Backward Prior Art (8)
Non-Patent Literature (5)
- Foreign communication related to a counterpart application dated Mar. 27, 2008.
- Gidley et al. "Recent Advances in Hydraulic Fracturing", 1989, Society of Petroleum Engineers Monograph Series, Richardson, TX Cht 5 pp. 95-108.
- Iversen et al. Monitoring and Control of Drilling Utilizing Continuously Updated Process Models; IADC/SPE 99207, Feb. 2006.
- Saputelli et al. Real-Time Decision-making for Value Creation While Drilling; SPE/IADC 85314, 2003.
- SPE XP-002472183 "Enhancement of Real-Time Hydraulic Fracturing Models with Full 3-D Simulation" By M.P. Cleary.