Multi-zone, single trip well completion system and methods of use
Abstract
An improved well completion system for completing two or more separate production zones in a well bore during a single downhole trip is disclosed. The improved completion system comprises a completion assembly comprising two or more production zone assemblies and a completion tool assembly. Each production zone assembly may comprise an automatic system locating assembly and at least two inverted seal systems for sealing against the tool assembly.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 12 · Forward citations: 15.
Claims (2 — 2 Independent, 0 Dependent)
- Claim 1Independent Claim
A method of completing two or more production zones with a well completion system in a single downhole trip, comprising: assembling a plurality of production zone assemblies, each assembly comprising a production screen assembly having at least one production screen valve; locating a service tool assembly in a lowermost production zone assembly, the tool assembly having a deactivated opening tool that is activated after the tool has passed below a last production screen valve; assembling a production packer assembly comprising a setting tool to the production zone assemblies to form a completi
- Claim 2Independent Claim
Th
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 15 total)
References Cited — Backward Prior Art (12)
Non-Patent Literature (3)
- Office Action from related U.S. Appl. No. 11/615,529, mailed Apr. 16, 2008.
- Search Report for related International Patent Application No. PCT/US2007/068182.
- Written Opinion for related International Patent Application No. PCT/US2007/068182.