Patents
US 7,478,024 B2#605976 Most CitedExpiredUnited States (USPTO)Utility

Integrated reservoir optimization

63Forward Citations (#605976 Global)
3.7/yrCitation Velocity (#556046 Global)
7.60Citation PageRank (#1672994 Global)
27Prior Art Cited
2Claims (1 Indep. · 1 Dep.)
0Drawings / Sheets

Abstract

A method of managing a fluid or gas reservoir is disclosed which assimilates diverse data having different acquisition time scales and spatial scales of coverage for iteratively producing a reservoir development plan that is used for optimizing an overall performance of a reservoir. The method includes: (a) generating an initial reservoir characterization, (b) from the initial reservoir characterization, generating an initial reservoir development plan, (c) when the reservoir development plan is generated, incrementally advancing and generating a capital spending program, (d) when the capital spending program is generated, monitoring a performance of the reservoir by acquiring high rate monitor data from a first set of data measurements taken in the reservoir and using the high rate monitor data to perform well-regional and field-reservoir evaluations, (e) further monitoring the performance of the reservoir by acquiring low rate monitor data from a second set of data measurements taken in the reservoir, (f) assimilating together the high rate monitor data and the low rate monitor data, (g) from the high rate monitor data and the low rate monitor data, determining when it is necessa

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 27 · Forward citations: 63.

Claims (2 — 1 Independent, 1 Dependent)

  1. Claim 1Independent Claim

    A method of generating a simulator production and reserves forecast, a mechanism representing a process that is active in a reservoir being chosen in response to a first development plan for developing a reservoir, comprising the step of: (a) in response to a history calibrated model, an implementation plan of said mechanism, and a set of constraints, executing a simulator production and reserves forecast model and, responsive thereto, generating a simulator production and reserves forecast representing a manner by which said reservoir responds to said first development plan, wherein said set

  2. Claim 2Depends on #1

    The method of claim 1 , f

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Non-Patent Literature (5)

  • "IRO Integrated Reservoir Optimization", http://connect.slb.com/IRO/html. Dec. 1, 1999, 18 pages.
  • Athichanagorn, S. and Horne, R.N.: "Automated Parameter Estimation From Well Test Data Using Artificial Neural Network," SPE 30556, Presented at the SPE Annual Technical Conference & Exhibition, Dallas, TX, Oct. 22-25, 1995, 14 pages.
  • Beamer, A., Bryant, I., Denver, L., Saeedi, J., Verma, V., Mead, P., Morgan, C., Rossi, D., Sharma, S., "From Pore to Pipeline, Field-Scale Solutions", Reprint from Oilfield Review, Summer 1998, pp. 2-19.
  • Fukuda, T. and Shibata, T.: "Theory and Applications of Neural Networks for Industrial Control Systems," IEEE Transactions on Industrial Electronics, vol. 39, No. 6, Dec. 1992, 18 pages.
  • Ivanenko, B. Kostyuchenko, S., Parfenov, A., Muslimov, E., Yampolsky, V., "Application of Neural Networks of Analysis, Imitation Modellling and Optimal Control of Oil Fields", IEEE 2000, pp. 17-20.