Method for construction and completion of injection wells
Abstract
A method for well construction and completion is disclosed. Generally the method comprises the steps of 1) drilling through an injection zone, 2) positioning an extendable permeable element on the casing capable of stopping formation material from entering the well bore, 3) positioning the casing such that the extendable elements are aligned with the injection zone, 4) extending the member such that they come into direct contact with the injection zone formation, 5) running tubing/completion equipment, and 6) begin injecting the desired fluids into the well. Thus eliminating the need to perforate and gravel pack the well while improving reliability of the injection well completion.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 9 · Forward citations: 25.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
A method of injection well construction comprising: drilling a borehole through an injection zone of a formation having formation fluid therein; running, into the borehole, casing including an extendable assembly comprising a fixed portion and a moveable portion having a filter media at its distal end so that the extendable assembly is positioned adjacent a site in the injection zone; providing a production well in the formation discrete from said borehole; extending the moveable portion of the extendable assembly to contact the formation forming a conduit between an interior of the casing and
- Claim 2Depends on #1
The method of claim 1 , further comprising the step of: cementing the casing in place after the extending step, but before the injecting step.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗