Integration of MES and controls engineering
Abstract
The invention relates to a system and a method for integrated development of projects of different levels, especially of automation projects in the MES and Controls area. The integrated development is facilitated by the use of uniform models. In this case a first project planning solution, especially an automation solution at the control level, is created in a first project planning environment ( 1 ), a second project planning solution, especially a solution for coordination of processes and/or execution sequences of the first project planning solution, is created in at least a second project planning environment ( 2 ) with a common data and/or object model being used by the project planning environments at least for the creation of the project planning solutions of the project planning environments and data and/or objects being identified in one of the two project planning solutions for use in the other project planning solution in each case.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 20 · Forward citations: 4.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
A system for integrated development of a plurality of automation projects, comprising: a first project planning environment for creating a first project planning solution; a second project planning environment for creating a second project planning solution; a common object model having a plurality of objects, the common object model used in the first and second project planning environments; and an identifier that identifies the objects used in either the first or second project planning solution, wherein the identified objects are also used in the other project planning solution.
- Claim 2Depends on #1
The system as claimed in claim 1 , wherein the first project planning solution is an automation solution at a control level and the second project planning solution is a solution for a coordination of processes or execution sequences of the first project planning solution.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (4 of 4 total)
References Cited — Backward Prior Art (20)
Non-Patent Literature (2)
- Siemens, "Simatic WinCC-Prozessvisualisierung und Plattform für IT & Business Integration", 2004, pp. 1-16, XP002344817.
- Thomas Gerstner, Wolfgang Strozyk & Dietmar Vogt "Rationelles Projektleren von Automatisierungssystemen", 8130 ATP Automatisierungstechnische Praxis, Dec. 1994, pp. 42-45, vol. 36, No. 12, XP000483710, R.Oldenbourg Verlag, München, Germany.