Reducing wire erosion during damascene processing
Abstract
A damascene process incorporating a GCIB step is provided. The GCIB step can replace one or more CMP steps in the traditional damascene process. The GCIB step allows for selectable removal of unwanted material and thus, reduces unwanted erosion of certain nearby structures during damascene process. A GCIB step may also be incorporated in the damascene process as a final polish step to clean up surfaces that have been planarized using a CMP step.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 14 · Forward citations: 10.
Claims (3 — 2 Independent, 1 Dependent)
- Claim 1Independent Claim
A method of reducing erosion in a damascene process, comprising the steps of: arranging a barrier material in a trench in a substrate and on a surface of the substrate adjacent to the trench; arranging a conductor on the barrier material in the trench and over the surface of the substrate adjacent to the trench; selectively removing a first portion of the conductor using a first gas cluster ion beam (GCIB) process that is selective to the conductor; and removing a second portion of the conductor and a portion of the barrier material using a second GCIB process.
- Claim 2Depends on #1
The method of claim 1 , wherein the barrier material comprises tantalum or tantalum nitride and the conductor comprises at least any one of a polysilicon, tungsten, copper, and aluminum.
- Claim 3Independent Claim
A method of a damascene process, comprising the steps of: forming a trench in dielectric material
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗