Coiled tubing wellbore cleanout
Abstract
A method and apparatus for substantially cleaning fill from a borehole is described variously including running a coiled tubing assembly into the wellbore, creating a fluid vortex by circulating cleaning fluid through the coiled tubing, and pulling the coiled tubing and coiled tubing assembly out of the hole at a speed sufficient to substantially clean the particulate solids from the wellbore. An apparatus for substantially cleaning fill from a hole, including vertical, horizontal, or deviated wells also is provided.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 35 · Forward citations: 12.
Claims (3 — 1 Independent, 2 Dependent)
- Claim 1Independent Claim
A method of cleaning fill from a wellbore comprising: creating a localized slurry of particulate solids while circulating a cleanout fluid in a coiled tubing in the wellbore; and determining a POOH speed for the coiled tubing in the wellbore whereby the particulate solids in the wellbore are maintained uphole of an end of the coiled tubing while circulating the cleanout fluid at a flow rate that is less than a critical deposition velocity such that the particulate solids are substantially removed from the wellbore.
- Claim 2Depends on #1
The method of claim 1 wherein the POOH speed is determined by computer modeling.
- Claim 3Depends on #2
The method of claim 2 wherein the computer modeling further determines the POOH speed for a given type of fluid and for a particle size of the solids.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (12 of 12 total)
References Cited — Backward Prior Art (35)
Non-Patent Literature (5)
- A.A. Gavignet, et al., SPE 15417 "A Model for the Transport of Cuttings in Highly Deviated Wells"; (C) 1986.
- Alain A. Gavignet, et al., "Model Aids Cuttings Transport Prediction"; (C) 1989 Society of Petroleum Engineers; JPT Sep. 1989, p. 916-921.
- Alexander Sas-Jaworsky II, "Coiled Tubing . . . Operations and Services", Part 4; pp. 28-33; 1992.
- BJ Services Company, "Fill Removal", Chapter 4; Jan. 5, 2002.
- Brown, N.P., Bern, P.A., and Weaver, A., "Cleaning Deviated Holes: New Experimental and Theoretical Studies," SPE/IADC 18636, IADC/SPE Drilling Conference, New Orleans, Feb. 1989.