Patents
US 7,376,471 B2#1155000 Most CitedActiveUnited States (USPTO)Utility

System and method for exploiting a good starting guess for binding constraints in quadratic programming with an infeasible and inconsistent starting guess for the solution

45Forward Citations (#1155000 Global)
2.5/yrCitation Velocity (#1315022 Global)
2.73Citation PageRank (#8810176 Global)
18Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

The present invention provides an algorithm that does not relax the problem at the very onset, even if x f is infeasible. Instead, it solves the EQP with the initial guess for the active set without relaxing the problem. If this solution to the first EQP is not optimal, but nevertheless feasible, we can use this as our guess for the feasible point. This has the advantage of being a feasible point that is consistent with the initial active set, whereas the initial guess used in the previous method is not necessarily so.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 18 · Forward citations: 45.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method for controlling a multivariable system including the steps of: a) receiving a plurality of sensor signals indicating current conditions of the system; b) receiving a plurality of commands; c) determining the desired dynamic response of the system based upon the commands and the sensor signals; d) in each of a plurality of time steps, formulating a problem of controlling the system to achieve the desired dynamic response as a solution to a quadratic programming problem; e) solving the quadratic programming problem in each time step using an iterative algorithm which searches for an opt

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (15 of 45 total)

PatentTitleYearCitations
US 10,418,832 B2Electrical energy storage system with constant state-of charge frequency response optimization20197
US 10,012,158 B2Optimization-based controls for an air handling system using an online reference governor20180
US 11,009,251 B2Electrical energy storage system with variable state-of-charge frequency response optimization20210
US 11,163,271 B2Cloud based building energy optimization system with a dynamically trained load prediction model20215
US 2016025020 A1Optimization-based controls for diesel engine air-handling systems—29
US 11,774,948 B2High level central plant optimization20230
US 11,159,022 B2Building energy optimization system with a dynamically trained load prediction model20216
US 10,700,541 B2Power control system with battery power setpoint optimization using one-step-ahead prediction20203
US 10,190,789 B2Central plant with coordinated HVAC equipment staging across multiple subplants20194
US 10,742,055 B2Renewable energy system with simultaneous ramp rate control and frequency regulation20200
US 11,210,617 B2Building management system with electrical energy storage optimization based on benefits and costs of participating in PDBR and IBDR programs20214
US 9,235,657 B1System identification and model development201679
US 11,156,380 B2Building control systems with optimization of equipment life cycle economic value while participating in IBDR and PBDR programs20211
US 10,250,039 B2Energy storage controller with battery life model201911
US 10,389,136 B2Photovoltaic energy system with value function optimization201910