Patents
US 7,367,396 B2#524681 Most CitedActiveUnited States (USPTO)Utility

Blowout preventers and methods of use

68Forward Citations (#524681 Global)
3.8/yrCitation Velocity (#536024 Global)
6.07Citation PageRank (#2414034 Global)
44Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

Methods and apparatuses for severing a wellbore tubular, the apparatus, in certain aspects, including: a first member movable toward a tubular to be severed; a second member with a second blade disposed opposite to the first member and movable toward the tubular; a first blade on the first member having a projection projecting from a center of a blade body with point structure on the projection for puncturing the tubular and cutting surfaces on the projection for cutting the tubular; and cutting surfaces, as needed, on the blade body adjacent the projection for cutting the tubular.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 44 · Forward citations: 68.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method for severing an oilfield tubular, the oilfield tubular useful for wellbore operations, the method comprising inserting a tubular into a blowout preventer, the blowout preventer including a tubular severing apparatus comprising a first shear ram block movable toward the tubular, a second shear ram block movable toward the tubular, a first blade on the first shear ram block, the first blade comprising a first blade body, a first projection projecting from the first blade body, a first point structure on the first projection for contacting and puncturing the tubular, first projection cut

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Non-Patent Literature (3)

  • Land & Marine Drilling: Cameron Iron Works Oil Tool Division: pages Cover. 1604. 1617. 1621: 1982 - 1983.
  • Shear Ram Capabilities Study: West Engineering Services: pages Cover to 4 - 7 (23 pages): Sep. 2004.
  • Varco's NXT Next Generation BOP Systems reduce the cost of Drilling: Varco; 6 pages: 2001.