Patents
US 7,363,983 B2#6464511 Most CitedExpiredUnited States (USPTO)Utility

ESP/gas lift back-up

15Forward Citations (#6464511 Global)
0.8/yrCitation Velocity (#8738219 Global)
2.06Citation PageRank (#13823556 Global)
6Prior Art Cited
2Claims (1 Indep. · 1 Dep.)
0Drawings / Sheets

Abstract

A well production system has a string of production tubing with a junction having two legs. A first leg is sealed to the casing by a packer located above well perforations. A submersible pump assembly is secured to a second leg, the pump having an intake in the tubing annulus surrounding the first leg. A gas lift valve is secured to the tubing. A port in the first leg allows well fluid to flow out of the first leg to the intake while in the pumping mode. In the pumping mode, a barrier is placed in the first leg above the port and the port opened to cause well fluid to the pump intake. In the gas lift mode, the port is closed and a barrier is placed between the second leg and the first leg.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 6 · Forward citations: 15.

Claims (2 — 1 Independent, 1 Dependent)

  1. Claim 1Independent Claim

    An apparatus for producing a well, comprising: a string of tubing for installation in the well, the tubing having a main section terminating in first and second legs, the first leg adapted to be in communication with the well fluid; a pump having an outlet in communication with the second leg and an intake for receiving well fluid to pump through the second leg into the main section while the apparatus is in a pumping mode; a gas lift valve in the tubing for admitting into the tubing gas pumped down the well to induce the flow of well fluid up the first leg and into the main section while in a

  2. Claim 2Depends on #1

    The apparatus according to claim 1 , further comprising: a first leg barrier that selectively bloc

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Non-Patent Literature (5)

  • Combined ESP/Auto Gas lift Completion Design-Stag Field, published 6<SUP>th </SUP>European ESP Roundtable on Feb. 15, 2000.
  • Combined ESP/Gas Lift Completions in High GOR/High Sand Wells on Australian Northwest Shelf, b;y K.J. Aitken, published SPE Gulfcoast ESP Workshop on Apr. 25, 2001.
  • ESP-Gas Lift Combination-A Successful Trial for the First Time, published SPE Gulfcoast ESP Workshop on Apr. 28, 1999.
  • ESP's and Gas Lift on Long Subsea Tie-Backs-Experiences from Development Challenges in the Gannet E Field, by P. Holweg, published 7<SUP>th </SUP>European ESP Roundtable on Feb. 6, 2002.
  • Production Optimization by Combined Artificial Systems and Its Application, published SPE Gulfcoast ESP Workshop on Apr. 28, 1999.