System and methodology for calculating the cost of future semiconductor products using regression analysis of historical cost data
Abstract
A method and structure for predicting semiconductor product costs at a fabricator entailing a storage medium which includes a database of historical critical dimensions and historical critical groundrules correlated to cost functions at the fabricator. The user interface has user inputs for new design parameters and new critical groundrules associated with a new device to be produced at the fabricator and a computer adapted to receive the user inputs, extract data from the storage medium, and compute semiconductor costs for the new device. The historical critical dimensions and the new critical dimensions are gate dimensions and the new critical dimensions are smaller than the historical critical dimensions. This device includes a future technology generation. Fabrication hardware and fabrication methods for producing the future technology generation are unknown and the relationships comprise base models and models that include options. The relationship comprise models that illustrate that costs increase exponentially as the historical critical dimensions and the historical critical groundrules are reduced.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 8 · Forward citations: 11.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A system for calculating semiconductor product costs at a fabricator comprising: a storage medium including a database of historical costs and historical critical gate dimensions of different technologies run at said fabricator; a user interface adapted to receive user inputs for new design parameters and new critical gate dimensions associated with a new device to be produced at said fabricator; and a computer adapted to: receive said user inputs; perform a regression analysis using said historical critical gate dimensions as independent variables and said historical costs as dependent variab
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (11 of 11 total)
References Cited — Backward Prior Art (8)
Non-Patent Literature (5)
- Bob Griffin, "Enhanced dataConductor Introduced by Syntricity at the International Test Conference 2000 in Atlantic City", Oct. 2000, available at www.syntricity.com.
- Eugene S. Meieran, "21st Semiconductor Manufacturing Capabilities" (hereinafter "Manufacturing")Dec. 1999, available at http://www.intel.com/technology/itj/q41998/articles/art<SUB>-</SUB>1.htm.
- Eugene S. Meieran, “21st Semiconductor Manufacturing Capabilities” (hereinafter “Manufacturing”)Dec. 1999, available at http://www.intel.com/technology/itj/q41998/articles/art—1.htm.
- Gibson et al., "Statistically Based Parametric Yield Prediction for IC"Nov. 1997, 14 pages, IEEE Transactions On Semiconductor Manufacturing, vol. 10, No. 4.
- Meieran, Eugene S, "21st Century Semiconductor manufacturing capabilities", Q4, 1998, Intel Technology Journal.