Track sledding machine
Abstract
The invention relates to a machine for use in track sledding operations. Machine ( 1 ) comprises a wagon ( 2 ) having adjustably carried therebeneath a multibladed plough ( 3 ). A rail clamp assembly ( 4 ) is included for suspending the track above the plough during the sledding operations.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 24 · Forward citations: 1.
Claims (3 — 1 Independent, 2 Dependent)
- Claim 1Independent Claim
A track sledding machine comprising: a railway wagon having adjustably carried therebeneath a plough comprising at least one plough blade having a length greater than the width of the track ballast bed; and rail clamps for suspending said track above said plough to allow continuous ploughing of ballast with movement of said wagon whereby said plough displaces said ballast beyond at least one side of the ballast bed, wherein said rail clamps comprise a subassembly pivotally linked to said wagon, the subassembly comprising a pair of longitudinally extending arms with clamps at each end of an arm
- Claim 2Depends on #1
The machine according to claim 1 , wherein said wagon is adapted for connection to a locomotive and comprises a horizontal frame with spaced apart bogies having a vertical frame thereon for mounting of machine components.
- Claim 3Depends on #1
The machine according to claim 1
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (1 of 1 total)
| Patent | Title | Year | Citations |
|---|---|---|---|
| US 9,428,866 B2 | Segmented railway regulator blade | 2016 | 2 |
References Cited — Backward Prior Art (24)
Non-Patent Literature (1)
- Dictionary.LaborLawTalk.com at www.encyclopedia.laborlawtalk.com/Rail<SUB>-</SUB>tracks, May 11, 2005.