Seismic measurements while drilling
Abstract
Measurements are made continuously with a seismic while drilling (SWD) system and the measured data are stored in a working memory of a downhole processor along with quality control (QC) measurements. The QC data are analyzed and based on the analysis, portions of the data in working memory are recorded in permanent memory for retrieval. Alternatively, QC measurements are made substantially continuously predictions are made when data quality for SWD measurements are likely to be good. Recording of SWD data are then started based on the prediction.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 7 · Forward citations: 10.
Claims (3 — 1 Independent, 2 Dependent)
- Claim 1Independent Claim
A method for making measurements during drilling of a borehole, the method comprising: (a) making measurements continuously with a formation evaluation (FE) sensor on a bottom hole assembly (BHA); (b) concurrently making quality control (QC) measurements while said FE measurements are being made, said QC measurements including at least one measurement not related to motion of said BHA; (c) storing samples of said FE measurements in a working memory of a processor on said BHA; (d) analyzing said QC measurements; and (e) based on said analysis, storing selected samples of said FE measurements in
- Claim 2Depends on #1
The method of claim 1 wherein said FE sensor comprises at least one hydrophone responsive to a seismic signal from a surface source.
- Claim 3Depends on #1
The method of claim 1 wherein said FE sensor comprises at least one geophone
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗