Patents
US 7,298,656 B2#36201947 Most CitedExpiredUnited States (USPTO)Utility

Process monitoring by comparing delays proportional to test voltages and reference voltages

2Forward Citations (#36201947 Global)
0.1/yrCitation Velocity (#43847588 Global)
1.19Citation PageRank (#32604826 Global)
13Prior Art Cited
3Claims (1 Indep. · 2 Dep.)
0Drawings / Sheets

Abstract

An evaluation circuit includes a test circuit configured to provide a test voltage indicative of a characteristic of a semiconductor device, a reference circuit configured to provide a first reference voltage, a first delay circuit configured to convert the test voltage into a first delay, a second delay circuit configured to convert the first reference voltage into a second delay, and a first latching circuit configured to determine a relationship between the first delay and the second delay.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 13 · Forward citations: 2.

Claims (3 — 1 Independent, 2 Dependent)

  1. Claim 1Independent Claim

    An evaluation circuit comprising: a test circuit configured to provide a test voltage indicative of a characteristic of a semiconductor device; a reference circuit configured to provide a first reference voltage; a first delay circuit configured to convert the test voltage into a first delay; a second delay circuit configured to convert the first reference voltage into a second delay; and a first latching circuit configured to determine a relationship between the first delay and the second delay.

  2. Claim 2Depends on #1

    The evaluation circuit of claim 1 , wherein the characteristic of the semiconductor device is a characteristic of a transistor in the semiconductor device.

  3. Claim 3Depends on #2

    The evaluation circuit of claim 2 , wherein the transistor is one of a negative channel field effect transistor and a positive channel field effect transistor.

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗