Paver and method for simultaneously casting several paving material layers
Abstract
At least two paving screeds B 1 , B 2 which are distant in operation running direction R are supported at a chassis 1 of a paver F. The paver F is designed for simultaneously casting several paving material layers L 1 , L 2 on top of each other on a plane P. Each paving screed B 1 , B 2 is provided with a compaction assembly. One paving screed B 1 for casting a lower layer L 1 is provided at a front end section of the chassis 1 and has the compaction assembly 13, 14 for generating a degree of compaction in the lower layer L 1 which suffices to withstand the direct contact of the undercarriage 2 . At least one further paving screed B 2 for casting an upper layer L 2 is arranged behind the undercarriage 2 . According to the method to be carried out with the paver F the lower layer which is cast and compacted in front of the undercarriage allows to run the undercarriage 2 on the lower layer while the upper layer L 2 is cast and compacted behind the undercarriage 2.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 13 · Forward citations: 5.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A paver for casting at least two layers of material on a surface, one layer on top of the other layer, comprising: a chassis carried by an undercarriage, a first paving screed on the front end of said chassis that has at least one of a selectively adjustable height or a selectively adjustable blade angle for casting a lower layer of material from material previously deposited adjacent to the surface; a second paving screed on the rear end of said chassis, said second paving screed separated from said first paving screed by a distance in the casting running direction of said undercarriage for c
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗