Patents
US 7,243,738 B2#6751220 Most CitedExpiredUnited States (USPTO)Utility

Multi seam coal bed/methane dewatering and depressurizing production system

14Forward Citations (#6751220 Global)
0.7/yrCitation Velocity (#10329256 Global)
3.19Citation PageRank (#6872829 Global)
11Prior Art Cited
2Claims (1 Indep. · 1 Dep.)
0Drawings / Sheets

Abstract

A process for underbalanced drilling into multiple coal and shale formations, and dewatering the drilled formations, which includes drilling a first borehole through several coal seams to a certain depth; lowering an upstock on the end of a carrier string to the depth of the upper coal seam; lowering a drill string in the carrier string, and angling off of the upstock, to drill a lateral or horizontal borehole within the coal seam; repeating the process for the second coal seam; setting a packer in place above the first coal seam in the annulus between the cased borehole and the carrier string; forming perforations in the wall of the carrier string below the packer; retrieving the upstock from the carrier string; lowering an electrical submersible pump to the bottom of the principal borehole; pumping water from the sump portion to the surface within the annulus of the second drill string.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 11 · Forward citations: 14.

Claims (2 — 1 Independent, 1 Dependent)

  1. Claim 1Independent Claim

    A process for production of methane and shale gas from coal and shale formations utilizing underbalanced multilateral drilling, comprising the following steps: a. drilling a first borehole into a coal/shale formation; b. lowering a carrier string with a deflection member down the first borehole to the level of the coal/shale formations c. lowering a drill string into the carrier string to drill a lateral borehole off of the first borehole into the coal/shale formations d. introducing an inert gas down the annulus between the first borehole and the carrier string; e. pumping nitrogen/air/drilli

  2. Claim 2Depends on #1

    The process of claim 1 , wherein the first borehole is drilled to a depth

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗