Fuzzy time-of-use metering and consumption monitoring using load profile data from relative time transmit-only devices
Abstract
A system and method provide Time-of-Use (TOU) rate schedules that are bound by windows of time, i.e., a type of fuzzy switch time, which is bounded on both sides, rather than instantaneous switch times. The fuzzy TOU schedule defines the time of a tier switch as the end time of the first completed interval recorded after the start of some window of time. A monitoring system may be included that implements configurable usage filters that allow for the classification of usage in terms of interval data. Usage filters can be defined so that they are applied against individual interval readings, various aggregations of interval readings, and/or the statistical products of interval readings, etc. A filtering algorithm allows for the comparison of incoming and/or historical interval data against defined usage and schedule filters to determine if usage is abnormal and should be investigated further.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 28 · Forward citations: 12.
Claims (3 — 1 Independent, 2 Dependent)
- Claim 1Independent Claim
A method of applying a Time-of-Use (TOU) schedule to a relative-time metering device, comprising: determining an expected TOU tier in accordance with a TOU tier switch time; receiving interval data from said relative-time metering device; assigning said interval data to a current tier associated with said relative-time metering device; changing said current tier associated with said relative-time metering to said expected TOU tier if said current tier is not equal to said expected TOU tier; and assigning subsequent interval data in said expected TOU tier.
- Claim 2Depends on #1
The method of claim 1 , further comprising defining said TOU tier switch time as a window of time having a maximum length equal to an interval over which said interval data is accumulated.
- Claim 3Depends on #2
The method of claim 2 , further comprising receiving interval data from plural relative-time meteri
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (12 of 12 total)
References Cited — Backward Prior Art (28)
Non-Patent Literature (5)
- "AMR-Selecting the Right System", Water Watcher, Neptune Technology Group Inc., Jun. 2003, http://neptunetg.com/emplibrary/WWjune03.pdf, 20 pages, no date.
- "The Star(R) Fixed-Network AMR System", Hexagram, Inc., http://hexagram.com/star.shtml, 7 pages, no date.
- "UtilityIQ AM-Advanced Metering Application", Silver Springs Network, 2005, http://www.silverspringnetworks.com/download/SilverSpringNetworks<SUB>-</SUB>UtilityIQ-AM.pdf, 4 pages, no date.
- "Water Interface Management Unit", Silver Springs Network, 2005, 2 pages, http://www.silverspringnetworks.com/download/SilverSpringNetworks<SUB>-</SUB>WaterIMU.pdf, 2 pages, no date.
- Macke, S. et al., "BMFO User Guide", Bulk Meter Flow and Operations, Northern Governorates Water Administration, 2003, (No month), http://bmfo.sourceforge.net/doc/user/en/bmfo<SUB>-</SUB>user<SUB>-</SUB>guide.pdf, 12 pages.