Patents
US 7,230,736 B2#7772628 Most CitedExpiredUnited States (USPTO)Utility

Planning and scheduling reconfigurable systems with alternative capabilities

13Forward Citations (#7772628 Global)
0.7/yrCitation Velocity (#11202076 Global)
2.01Citation PageRank (#14408968 Global)
8Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A system is provided to allow automated planning and scheduling of the work flow for reconfigurable production systems having a plurality of modules, with each module having alternative capabilities. The system includes a system controller, at least one planning function, and at least one scheduling function.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 8 · Forward citations: 13.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A computer controlled system for planning and scheduling the work flow, received in the form of work units, for reconfigurable production systems having a plurality of modules with a plurality of alternative capabilities, the system comprising: a system controller for integrating resource constraints and time constraints to identify optimal work flow schedules, wherein said controller receives descriptions of at least one work unit with its desired attributes, capability models from each of the plurality of modules, and the current state of the system, including operations currently being perf

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Non-Patent Literature (2)

  • G.J. Garwood and A.C. Robinson, "Work Management System", British Telecommunication Engineering, London, GB, vol. 10, Oct. 1991, pp. 204-210.
  • Robert P. Goldman and Mark S. Boddy, "A Constraint-Based Scheduler for Batch Manufacturing", IEEE Expert, IEEE Inc. New York, vol. 12, No. 1, Jan.-Feb. 1997, pp. 49-56.