Patents
US 7,225,869 B2#260906 Most CitedExpiredUnited States (USPTO)Utility

Methods of isolating hydrajet stimulated zones

96Forward Citations (#260906 Global)
5.0/yrCitation Velocity (#269541 Global)
6.47Citation PageRank (#2178789 Global)
21Prior Art Cited
2Claims (2 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

The present invention is directed to a method of isolating hydrajet stimulated zones from subsequent well operations. The method includes the step of drilling a wellbore into the subterranean formation of interest. Next, the wellbore may or may not be cased depending upon a number of factors including the nature and structure of the subterranean formation. Next, the casing, if one is installed, and wellbore are perforated using a high pressure fluid being ejected from a hydrajetting tool. A first zone of the subterranean formation is then fractured and stimulated. Next, the first zone is temporarily plugged or partially sealed by installing an isolation fluid into the wellbore adjacent to the one or more fractures and/or in the openings thereof, so that subsequent zones can be fractured and additional well operations can be performed.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 21 · Forward citations: 96.

Claims (2 — 2 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method of completing a well in a subterranean formation, comprising the steps of: (a) perforating a first zone in the subterranean formation by injecting a pressurized fluid through a hydrajetting tool into the subterranean formation, so as to form one or more perforation tunnels; (b) initiating one or more fractures in the first zone of the subterranean formation by injecting a fracturing fluid into the one or more perforation tunnels through the hydrajetting tool; (c) pumping additional fracturing fluid into the one or more fractures in the first zone through a wellbore annulus in which th

  2. Claim 2Independent Claim

    The method of completing a well according to

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Non-Patent Literature (1)

  • Foreign communication from related counterpart application dated Jun. 16, 2005.