Smart cementing systems
Abstract
The present invention provides methods and apparatus for determining the location of an apparatus in a wellbore. The method includes lowering the apparatus with a conveying member and measuring a parameter associated with the conveying member. Thereafter, the measured parameter is used to determine the location of the apparatus as well as other conditions in the wellbore. The apparatus includes a conveying member operatively connected to an object released downhole. The apparatus may also include a dispensing apparatus coupled to one end of the conveying member. Preferably, the conveying member is a fiber optics line capable of transmitting optical signals. Other types of conveying members include a wire, a tube, and a cable. Additionally, a sensor may be disposed on the object and connected to the conveying member.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 28.
Claims (3 — 2 Independent, 1 Dependent)
- Claim 1Independent Claim
A method of determining a location of an apparatus in a wellbore, comprising: lowering a first cementing apparatus into the wellbore; lowering a second cementing apparatus into the wellbore with a conveying member and mating the second cementing apparatus with the first cementing apparatus; relocating both the first and the second cementing apparatus to a lower position in the wellbore; measuring a parameter associated with the conveying member; and using the measured parameter to determine the location of the first and the second cementing apparatus, wherein the parameter is measured using a
- Claim 2Depends on #1
The method of claim 1 , wherein the parameter measured enables a determination of a length of the conveying member.
- Claim 3Independent Claim
The method
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 28 total)
References Cited — Backward Prior Art (50)
Non-Patent Literature (5)
- "The Final Frontier: Fiber Optics Promise Real-Time Information On Well Drilling," GTI Journal, Winter/Spring 2002.
- Canadian Office Action, Application No. 2,442,475, dated Feb. 21, 2006.
- GTI's Friction Brake.
- PCT Search Report, Application No. GB 0322533.1, dated Jan. 6, 2004.
- U.S. Appl. No. 10/464,433, filed Jun. 18, 2003, LoGiudice, et al.