Method for optimizing a large-scale industrial facility, especially a power plant
Abstract
The invention relates to a method for optimizing a large-scale industrial facility, especially a power plant, consisting of m subassemblies (BGj), wherein j=1(1)m) and wherein the following steps are successively carried out: comparing the parameters (KGj) of all subassemblies (BG 1 to BGj) with predetermined reference values (RWj); detecting the subassemblies (Bgi) with i=1(1)m, whose parameters (KG 1 ) are worse than the reference values (RWi) and optimizing the subassemblies (BG 1 ) whose parameters (KGi) are worse than the reference values (RW 1 ).
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 9 · Forward citations: 0.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for optimizing a steam power station having at least one boiler assembly, at least one steam turbine assembly, at least one condenser assembly, at least one generator assembly and at least one flue gas cleaning device, the method comprising the steps of: comparing the characteristic variables of the at least one boiler assembly, of the at least one steam turbine assembly, of the at least one condenser assembly, of the at least one generator assembly and of the at least one flue gas cleaning device with predetermined reference values; determining those assemblies of the at least one bo
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (9)
Non-Patent Literature (1)
- PCT International Search Report dated Dec. 17, 2002 for PCT/EP02/10223.