Apparatus and method for monitoring a treatment process in a production interval
Abstract
An apparatus ( 50 ) for monitoring a treatment process in a treatment interval ( 58 ) includes a packer assembly ( 60 ) and a sand control screen assembly ( 64 ) connected relative to the packer assembly ( 60 ). A cross-over assembly ( 62 ) provides lateral communication paths ( 92, 98 ) downhole and uphole of the packer assembly for respectively delivering of a treatment fluid ( 84 ) and taking return fluid. A wash pipe assembly ( 76 ) is positioned in communication with the lateral communication path ( 98 ) uphole of the packer assembly ( 60 ) and extending into the interior of the sand control screen assembly ( 64 ). At least one sensor ( 80 ) is operably associated with the wash pipe assembly ( 76 ) to collect data relative to at least one property of the treatment fluid during a treatment process such that a characteristic of the treatment fluid ( 84 ) is regulatable during the treatment process based upon the data.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 17.
Claims (3 — 1 Independent, 2 Dependent)
- Claim 1Independent Claim
A method for treating a production interval of a wellbore, the method comprising the steps of: positioning a sand control screen assembly within the production interval; disposing a wash pipe assembly interiorly of the sand control screen assembly; injecting a treatment fluid into the production interval exteriorly of the sand control screen assembly; sensing data relative to a property of the treatment fluid during the injecting with a sensor operably associated with the wash pipe; and regulating a characteristic of the treatment fluid during the injecting based upon the data.
- Claim 2Depends on #1
The method as recited in claim 1 further comprising relaying the data to the surface via an energy conductor integrally associated with the wash pipe.
- Claim 3Depends on #1
The method as recited in claim 1 further comprising relaying the data to a downhole processor.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 17 total)
References Cited — Backward Prior Art (50)
Non-Patent Literature (5)
- Ebinger of Ely & Associates Inc.; "Frac Pack Technology Still Evolving"; 1995; pp. 60-70; Oil & Gas Journal.
- Hailey and Cox of Haliburton Energy Services, Inc. and Johnson of BP Exploration (Alaska); "Screenless Single Trip Multizone Sand Control Tool System Saves Rig Time"; Feb. 2000; pp. 1-11; Society of Petroleum Engineers Inc.
- Halliburton Energy Services, Inc.; "Absolute Isolation System (AIS) Components"; 1 page.
- Halliburton Energy Services, Inc.; "CAPS Concertric Annular Packing Service for Sand Control"; Aug. 2000; 4 pages.
- Halliburton Energy Services, Inc.; "Caps Sand Control Service for Horizontal Completions Improves Gravel Pack Reliability and Increases Production Potential from Horizontal Completions"; Aug. 2000; 2 pages.