Patents
US 7,139,784 B2#5406403 Most CitedExpiredUnited States (USPTO)Utility

Dead timestamp identification and elimination

17Forward Citations (#5406403 Global)
0.8/yrCitation Velocity (#8588350 Global)
2.50Citation PageRank (#10196284 Global)
2Prior Art Cited
2Claims (1 Indep. · 1 Dep.)
0Drawings / Sheets

Abstract

The performance of an application is improved by identifying and eliminating items with dead time-stamps and eliminating work on items with irrelevant time-stamps. An algorithm executing in each node of a task graph computes and propagates guarantees which are used to eliminate both items with dead time-stamps and irrelevant computation on dead time-stamps. A continuous garbage collector eliminates items with dead time-stamps while the node continues to process received items. Unnecessary computations are reduced by automatically discerning the interest set of downstream modules for time-stamps and feeding the interest set back to upstream modules.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 2 · Forward citations: 17.

Claims (2 — 1 Independent, 1 Dependent)

  1. Claim 1Independent Claim

    A method of garbage collection and scheduling performed at individual nodes of a processing graph, comprising the computer implemented steps of: for a given node, based on (a) forward guarantees received from preceding nodes indicating earliest timestamps to be sent from the preceding nodes and (b) backward guarantees received from successive nodes indicating earliest timestamps to be used at the successive nodes, determining timestamp requirements for data to be processed in the node; returning to preceding nodes a backward guarantee of earliest timestamps to be used at the node; and at the p

  2. Claim 2Depends on #1

    The method as claimed in claim 1 further comprising the step of: propagating a forward guarantee to successive nodes based on forward guarantees received f

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Non-Patent Literature (5)

  • A. D. Christian and B. L. Avery, "Digital Smart Kiosk Project," In ACM SIGCHI 98, pp. 155-162, Los Angeles, CA, Apr. 18-23, 1998.
  • D. R. Jefferson, "Virtual Time," ACM Transactions on Programming Languages and Systems, 7 (3):404-425, Jul. 1985.
  • J. M. Rehg, et al., "Vision for a Smart Kiosk," In Computer Vision and Pattern Recognition, pp. 690-696, San Juan, Puerto Rico, Jun. 17-19, 1997.
  • K. Knobe, et al., Scheduling constrained dynamic applications on clusters. In Proc. SC99: High Performance Networking and Computing Conf., Portland, OR, Nov. 1999. Technical paper.
  • K. M. Chandy and J. Misra, "Asynchronous Distributed Simulation via a Sequence of Parallel Computations," Communications of the ACM, 24:198-206, 1981.