Powerline network flood control restriction
Abstract
A transmit process that limits the time during which a reduced network bandwidth exists between two powerline nodes because a receiving node fails to respond to frame transmission attempts by a transmitting node is described. The transmit process restricts the number of retries that occur in a lower date rate transmission mode and, for a predetermined time period to follow, drops all subsequent frames destined for the non-responding node.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 12.
Claims (3 — 1 Independent, 2 Dependent)
- Claim 1Independent Claim
In a network of nodes, each node having a transmitter and a receiver, a method of operating a transmitter in a node comprises: transmitting, in at least one transmission attempt, a frame over a shared channel to a receiver in another node, the frame being of the type for which a response is expected; determining if no response is received from the receiver; discarding the frame; and discarding any subsequent frames destined for the receiver without any transmission attempt for a predetermined time interval.
- Claim 2Depends on #1
The method of claim 1 , further comprising: transmitting the frame to the receiver in reduced data rate transmission attempts until a threshold number of such reduced data rate transmission attempts have occurred without a response from the receiver.
- Claim 3Depends on #1
The method of claim 1 , wherein t
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗