Lifting restrictive signaling in a block
Abstract
A train control system and method uses signal information from a next block to change a restrictive signal in a block currently occupied by the train to a less restrictive signal if it can be ascertained that the condition causing the more restrictive signal has changed. This may be accomplished by receiving signal information from the next block while still in the current block and, if the signal information from the next block is no more restrictive than the signal information in the current block, and the signal in the current block is of a type that can safely be modified, allowing the train to operate as if the signal information for the current block were less restrictive than the actual, previously received signal information for the current block.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 8.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
A system for controlling a train, the system comprising: a control unit; and a receiver, the receiver being located on the train and being in communication with the control unit; wherein the control unit is configured to perform the steps of receiving signal information for a next block via the receiver; determining whether the signal information for a current block can be modified in a safe manner; determining whether the signal information for the next block is less restrictive than the signal information for the current block; and changing the signal information for the current block to a l
- Claim 2Depends on #1
The system of claim 1 , further
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (8 of 8 total)
References Cited — Backward Prior Art (50)
Non-Patent Literature (5)
- "A New World for Communications & Signaling", Progressive Railroading, May 1986, no specific date.
- "Advanced Train Control Gain Momentum", Progressive Railroading, Mar. 1986, no specific date.
- "ATCS Evolving on Railroads", Progressive Railroading, Dec. 1992, no specific date.
- "ATCS Moving slowly but Steadily from Lab for Field", Progressive Railroading, Dec. 1994, no specific date.
- "ATCS on Verge of Implementation", Progressive Railroading, Dec. 1989, no specific date.