Event overrun and downstream event shift technology
Abstract
Technology that allows the party who generates schedule information, e.g., television schedule information used as a basis for meta data, to easily and efficiently “overrun” a selected event by a user-defined number of minutes and also to select the number of downstream events that will be shifted as a result of the overrun is disclosed. Also, the end time of the overrunning and the start and end times of the user-selected number of downstream events can be automatically recalculated and rescheduled. The new start and end times can then be reviewed by the generating user before being committed to the meta data that will be included in the television signal, e.g., a digital multiplex television signal.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 7 · Forward citations: 13.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A computer-implemented method of automatically updating television schedule data for a plurality of serially-scheduled events telecast on the same channel, each event having a starting time and a duration, the method comprising: selecting a first one of said events that will extend beyond a scheduled duration thereof; providing, upon selection of the first one of the events that will extend beyond the scheduled duration, a graphic user Interface (GUI) including a first field for identifying an amount of the overrun, a second field for identifying the number of said events that will be delayed
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (13 of 13 total)
References Cited — Backward Prior Art (7)
Non-Patent Literature (1)
- Moseley et al., "Mastering Microsoft Office 97 Professional Edition", 1996, pp. 464-468.