Preconstruction anchoring system and method for buildings
Abstract
A system and method of installing a preconstruction support system for a building, according to which the corresponding ends of two piling sections are connected together and an a auger is provided on one or more of the piling sections. The piling sections are driven into the ground in a manner so that a portion of the uppermost piling section extends above ground; and a concrete slab encases the portion of the piling sections.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 29 · Forward citations: 9.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A preconstruction support system for a building, the system comprising: at least one screw anchor assembly comprising: at least two internally-threaded tubular piling sections; connecting apparatus for connecting the piling sections, the connecting apparatus comprising: a first externally-threaded member threadedly engaging one of of the internally threaded piling sections, a second externally-threaded member threadedly engaging the other of the internally threaded piling sections, and a connecting member engaging the first and second members to connect the piling sections in an abutting, end-
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗