Mono-trip cement thru completion
Abstract
In systems and methods for production of hydrocarbons fluids from a formation surrounding a wellbore, a production assembly is cemented into place, and excess cement is then cleaned from the production tubing and liner. Thereafter, hydrocarbon fluids are produced and artificial gas lift assistance is provided. All of this may be accomplished in a single trip (mono-trip) of the production tubing.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 9 · Forward citations: 22.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
A completion system for production of hydrocarbons from a formation surrounding a wellbore, the completion system comprising: a completion assembly for disposal into an annulus of a wellbore, the completion assembly defining a flowbore therewithin for flowing of fluid; a valve assembly incorporated within the completion assembly having a flow port that may be moved between a substantially opened position and a substantially closed position to selectively provide fluid communication between the flowbore and the annulus; a mandrel incorporated within the completion assembly and containing a cyli
- Claim 2Depends on #1
The completion system of claim 1 further comprising: a landing collar incorporated within the completion assembly for seating of a wiper plug; and a w
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗