Patents
US 7,027,992 B2#992578 Most CitedExpiredUnited States (USPTO)Utility

Method and computerized system for reducing risk in an energy industry

48Forward Citations (#992578 Global)
2.4/yrCitation Velocity (#1419252 Global)
15.50Citation PageRank (#511530 Global)
5Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A method and computerized system for reducing risk actually assumed by at least one of a plurality of parties, wherein at least one of the parties supplies electric power to at least one other of the parties, and if an unplanned at least partial failure to supply the electric power occurs, at least one of the parties assumes the risk. The method includes designating at least one factor associated with the supplying of electric power and for determining whether an unplanned at least partial failure to supply the electric power that occurs is a qualifying event; designating a compensation which will at least partially reduce the risk actually assumed by the at least one of the parties assuming the risk if the unplanned at least partial failure to supply the electric power occurs and is determined to be a qualifying event; and, establishing a relationship between the at least one of the parties assuming the risk and at least one other party. The at least one other party agrees to provide the compensation to the at least one of the parties assuming the risk if the unplanned at least partial failure to supply the electric power occurs and is determined to be a qualifying event.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 5 · Forward citations: 48.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A computer programmed method for reducing risk actually assumed by at least one of a plurality of parties, wherein at least one of said parties supplies electric power to at least one other of said parties, and if an unplanned, non-catastrophic at least partial failure to supply adequate electric power occurs, at least one of said parties assumes said risk, said method comprising: calculating via a computer program at least one factor associated with said supplying of electric power, wherein, based on the at least one factor, said computer program determines whether an unplanned inadequacy of

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Non-Patent Literature (5)

  • Andrew Webb, The rebirth of the power market, Derivatives Strategy, May 1999 (from http://www.derivativesstrategy.com/magazine/archive/999/0599fea2.asp).
  • Brevetti, Nuclear power Plants Soon will have two cover choices, New York, Aug. 28, 1986.
  • Brevetti's article on New York newspaper, Nuclear power plant soon will have two choices, New York, Aug. 28, 1986.
  • Ed Zaccaria, The power of insurance, Independent Energy, v29n7, pp. 24-25, Sep. 1999 (from Dialog(R) file 15, acc. No. 01976137).
  • Fitzgerald, Not so risky business . . . , Chemical Marketing Reporter, v250, n3 pSR18(1), Jul. 15, 1996.