Patents
US 7,006,920 B2#1961325 Most CitedExpiredUnited States (USPTO)Utility

Activity data capture system for a well service vehicle

33Forward Citations (#1961325 Global)
1.6/yrCitation Velocity (#2981822 Global)
3.97Citation PageRank (#4820455 Global)
34Prior Art Cited
3Claims (1 Indep. · 2 Dep.)
0Drawings / Sheets

Abstract

The present invention is directed to incrementing a well service rig in such a manner that activity-based and/or time-based data for the well site is recorded. The acquired data can be transmitted via wired, wireless, satellite or physical to a data center preferably controlled by the work-over rig owner, but alternately controlled by the well owner or another. The data can thereafter be used to provide the customer a detailed invoice or a searchable, secure web-based database. With such information, the customer can schedule other services at the well site. Further, the customer will have access to detailed data on the actual service performed. The present invention fosters a synergistic relationship among the customer and the service companies that promotes a safe environment by monitoring crew work activities and equipment speeds; improving productivity; reducing operation expenses through improved job processes; and better data management and reduced operational failures.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 34 · Forward citations: 33.

Claims (3 — 1 Independent, 2 Dependent)

  1. Claim 1Independent Claim

    A method of servicing a well at a wellsite, comprising: measuring a variable associated with servicing the well, electronically recording the measured variable on a first computer; inputting non-numerical activity data associated with servicing the well into a second computer; transferring the electronically recorded measured variable and activity data from the wellsite to a central location.

  2. Claim 2Depends on #1

    The method of claim 1 , wherein the measured variable is selected from the group consisting of hook load, tong torque, engine RPM, hydrogen sulfide concentration, block position, engine oil pressure, clutch air pressure, and global position.

  3. Claim 3Depends on #1

    The method of claim 1 , wherein the non-numerical activity is selected from the group consisting of rigging up a well service unit, pulling rods, pulling tubing, running tubing, running rods, rigging down

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Non-Patent Literature (4)

  • Graff, R.L., Tenneco Exploration & Production, and Varnado, S.G., NL Sperry Sun. SPE 14068. "Use of Data Center and Telecommunications in Drilling Operations and Engineering." (8 pages), 1986.
  • Keenan, Patrick G., Exploration Logging Overseas, Inc., and Dyson, Peter M., Exploration Logging (Services) Ltd. SPE 9620. "Wellsite Computers-Their Increasing Role in Drilling Operations." (6 pages), 1981.
  • Veenkant, R. and Vitali, J.D., Amoco Production Co. SPE 14072. "Satellite Communications Change Drilling Operations." (9 pages), 1986.
  • Walbe, Kim A., Walbe & Associates, Inc. SPE 30985. "Satellites and the Oilpatch or, Resolving the Heclarewe Problem." (4 pages), 1995.