Bridge construction system
Abstract
A method of constructing a bridge including forming a concrete slab remote from the bridge, the slab having a side with at least one bolt hole therein, orienting the side of the concrete slab substantially parallel to the side of a girder so that the bolt hole of the concrete slab is aligned with a bolt hole in the side of the girder and connecting the bolt hole of the concrete slab with the bolt hole of the girder using a bracket and a pair of bolts.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 12 · Forward citations: 3.
Claims (3 — 1 Independent, 2 Dependent)
- Claim 1Independent Claim
A bridge comprising, a first girder via at one bracket assembly with a side forming a first ridge, a second girder via at least bracket assembly with a side forming a first ridge, and a pre-cast concrete slab with opposing sides, wherein one of the opposing sides of the concrete slab is located substantially parallel to and connected with the side of the first girder and another of the opposing sides of the concrete slab is located substantially parallel to and connected with the side of the second girder.
- Claim 2Depends on #1
The bridge according to claim 1 wherein the concrete slab is in contact with the first ridge of the first girder and the first ridge of the second girder.
- Claim 3Depends on #1
The bridge according to claim 1 wherein the at least one bracket is connected with the concrete slab by a bolt.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗