Method for removing filter cake from injection wells
Abstract
A method is given for completing an interval of an open-hole injection well penetrating a subterranean formation when the interface between the wellbore and the formation includes a zone invaded by a filter cake that includes bridging materials and other embedded solid materials. The method includes the steps of injecting a clean-up fluid and contacting it with the filtercake for a period of time sufficient to loosen some of the other solids embedded in the filter cake; removing the loosened solids by a high-rate displacement fluid containing suspending additives; and then injecting a dissolving fluid containing a diverter and an effective amount of a salt or acid capable of dissolving the bridging material.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 16 · Forward citations: 43.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
A method for completing an interval of an open-hole injection wellbore penetrating a subterranean formation, said wellbore being communicating with the formation by way of an interface that comprises at least a filter cake invaded zone comprising bridging materials and other embedded solid materials and having not be allowed to produce prior to the completion, said method comprising: a) injecting a clean-up fluid and contacting it with the filtercake for a period of time sufficient to loosen some of the other solids embedded in the filter cake; b) then removing the loosened solids by a high-ra
- Claim 2Depends on #1
The method of claim 1 , further comprising a step wherein the well is allow
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 43 total)
References Cited — Backward Prior Art (16)
Non-Patent Literature (3)
- Morgenthaler L.N. et al. "Optimization of Stimulation Chemistry for Openhole Horizontal Wells" SPE 49098 presented at the 1998 SPE Annual Technical Conference and Exhibition held in New Orleans, Louisiana Sep. 27-30, 1998.
- Parlar, M., Brady, M. et al "Filtercake Cleanup Techniques for Openhole Water Injectors With Sand Control: Lessons From Laboratory Experiments and Recommendations for Filed Practices" SPE 77449 presented at the SPE Annual Technical Conference and Exhibition held in San Antonio, Texas Sep. 29, - Oct.
- U.S. Appl. No. 10/253,962, filed Sep. 24, 2002.