In-rush current management
Abstract
A duty cycle and period of clock stimulus signals of power conversion device are independently altered to handle in-rush current. In one embodiment, transient power supply turn on current observations coupled with changing of the duty cycle and period of clock stimulus (frequency) are used to select a duty cycle and frequency for the power conversion device. A programmable logic device is programmed with firmware in one embodiment to independently alter the duty cycle of the power conversion device. Optimization of the duty cycle and frequency occurs empirically at a higher level of assembly, allowing adjustments that account for both parasitic and process induced variations and system configuration adjustments. In further embodiments, in-rush current is measured during operation of the power conversion device, and the duty cycle and frequency are adjusted in real time in response to such measured current.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 8 · Forward citations: 7.
Claims (3 — 1 Independent, 2 Dependent)
- Claim 1Independent Claim
A method of modifying in-rush current during power-on for a power conversion system having a duty cycle and frequency, the method comprising: measuring the in-rush current following power-on; determining a new duty cycle and frequency for the power conversion system in response to the measured in-rush current; and storing the determined duty cycle and frequency for use by the power conversion system.
- Claim 2Depends on #1
The method of claim 1 wherein the elements are repeated in an iterative process to obtain optimal duty cycle and frequency.
- Claim 3Depends on #1
The method of claim 1 wherein the new duty cycle and frequency are determined empirically.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗