Precision alignment of tire building drum to automated tire building system working axis
Abstract
Method and apparatus for precision alignment of a moving tire building drum to an automated tire building system working axis, wherein the automated tire building system comprises one or more work stations with application drums aligned to the working axis, and the tire building drum is moved into and out of each work station, comprising: supporting the tire building drum on a rigid, two-sided drum support frame having flat skates with flat bearing rollers under one side, and V-skates with V-mounted bearing rollers under the other side; providing a rail system comprising first and second approximately parallel rails passing through the one or more work stations, wherein the first rail is substantially flat-topped, and the second rail is substantially inverted V-shaped on top; causing the one or more flat skates to ride on the first rail, and causing the one or more V-skates to ride on the second rail; and positioning the drum support frame, the flat skates, and the V-skates relative to the tire building drum and the first and second rails; and positioning the first and second rails relative to the working axis; such that when the flat skates ride on the first rail and the V-skates
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 29 · Forward citations: 0.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for aligning a plurality of tire building drums with a plurality of work stations of an automated tire building system, comprising: independently moving each tire building drum with a self-propelled vehicle traveling on a rail system having two parallel rails to the plurality of work stations; supporting and vertically aligning each tire building drum with at least one of the parallel rails at each of the work stations; and laterally aligning each tire building drum with only one of the parallel rails at each of the work stations; and further comprising: providing entry ramps on the r
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (29)
Non-Patent Literature (3)
- U.S. Appl. No. 09/957,731, filed Sep. 21, 2001, LeMaire et al.
- U.S. Appl. No. 09/957,740, filed Sep. 21, 2001, Durand et al.
- U.S. Appl. No. 09/957,785, filed Sep. 21, 2001, Zeh et al.