Drill-through spool body sleeve assembly
Abstract
A drill-through spool body sleeve assembly comprises a test sleeve removably installed within a drill-through spool body having a bore with the terminal ends of the outer diameter of the test sleeve sealingly engaging the bore wall. The sleeve assembly also comprises a wear bushing removably installed in the bore between the bore wall and the test sleeve. The test sleeve is of sufficient thickness to pressure test the spool body outlets, ports, and valves before drilling and production. The test sleeve seals the bore from the outside of the spool body during the pressure testing. After the pressure tests are completed, the test sleeve is removed from the spool body, leaving the wear bushing in place. The wear bushing protects the bore wall, outlets, ports, and valves while allowing equipment such as drilling and wellhead equipment to pass through the spool body. After the well is drilled and the casing strings are installed, the wear bushing is removed from the spool body to allow the installation of the production tubing and production hanger within the spool body.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 26 · Forward citations: 19.
Claims (3 — 2 Independent, 1 Dependent)
- Claim 1Independent Claim
A sleeve assembly for a drill-through spool body having a bore having a wall, the assembly comprising: a wear bushing removably installed in the bore; a test sleeve removably installed within the bore and within the wear bushing; the test sleeve allowing the drill-through spool body to be pressure tested; and the inside diameter of the wear bushing being large enough to allow the passage of equipment through the wear bushing.
- Claim 2Independent Claim
A sleeve assembly for a drill-through spool body having a bore having a wall, the assembly comprising: a wear bushing removably installed in the bore; a test sleeve removably installed within the bore and within the wear bushing; and at least a portion of the outer diameter of the test sleeve sealingly engaging the bore wall.
- Claim 3Depends on #2
The assembly of claim 2 wherein a first test sleeve terminal end sealingly
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 19 total)
References Cited — Backward Prior Art (26)
Non-Patent Literature (2)
- Cooper Oil Tool; Phillips Petroleum Company Ann Subsea Facility; TMH 04445; Nov. 1991; (pp. CCH 36064-36223).
- SPE 23145; Installation of Concentric Subsea Completions from a Jack-Up in the Welland Field: A Case History; Sep. 3-6, 1991; R.O. Sanders (pp. 405-415) (15 sheets drawings).