Method and apparatus measuring electrical anisotropy in formations surrounding a wellbore
Abstract
A logging tool is disclosed having transmitting and receiving antennas to measure formation anisotropy. The antennas may preferably be combinations of toroidal, horizontal electric dipole, and horizontal magnetic dipole antennas. In one embodiment, the tool: (a) induces a current flow in the tubing or drill string traversing the formation in a borehole; (b) measures a signal difference between two receiver antennas on the drill string; (c) determines an apparent conductivity of the formation from the resistive component of the signal difference; and (d) uses the apparent conductivity to calculate an anisotropy coefficient with a knowledge of the horizontal conductivity. The tool may further determine a second apparent conductivity of the formation from the reactive component of the signal difference, and use both apparent conductivities to calculate the anisotropy coefficient and the horizontal conductivity. The vertical conductivity can also be determined from these two calculated values in the usual manner.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 8 · Forward citations: 31.
Claims (3 — 1 Independent, 2 Dependent)
- Claim 1Independent Claim
A method comprising: transmitting a signal into a formation using a toroidal transmitter; measuring the signal difference between two toroidal receiver antennas on a tool in a borehole traversing the formation; determining an apparent conductivity of the formation from a resistive component of the signal difference; using the apparent conductivity to calculate anisotropy coefficient; and calculating the vertical conductivity.
- Claim 2Depends on #1
The method of claim 1 , further comprising: determining a second apparent conductivity of the formation from a reactive component of the signal difference; and using both apparent conductivities to calculate the anisotropy coefficient.
- Claim 3Depends on #2
The method of claim 2 , further comprising: using both apparent conductivities to calculate the horizontal conductivity.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 31 total)
References Cited — Backward Prior Art (8)
Non-Patent Literature (5)
- Anderson, B. et al., 1990, Response of 2-MHz LWD resistivity and wireline induction tools in dipping beds and laminated formations: SPWLA 31st Ann. Logging Symp., paper A.
- British Search Report dated Jan. 28, 2003, Application No. GB 0214674.4 (2 p.).
- Chemali, R., Gianzero, S. and S.M. Su, 1987, The effect of shale anisotropy on focused resistivity devices: SPWLA 28th Ann. Logging Symp., paper H.
- French Search Report dated Feb. 21, 2003, Application No. FA 620652 (2 p.).
- Gianzero, S. et al., 1985, A new resistivity tool for measurement-while-drilling: SPWLA 26th Ann. Logging Symp., paper A.