System for incrementally computing the maximum cost extension allowable for subsequent execution of each task using fixed percentage of the associated cost
Abstract
The present invention provides a method, system, and computer program product for improving scheduling of tasks in systems that accumulate execution time. An upper bound is computed on the amount of additional time each schedulable task in the system may continue to execute after exceeding its predetermined cost, without adversely affecting overall operation of the system (that is, ensuring that the continued execution will not cause invocations of subsequent tasks to fail to meet their execution deadlines). By allowing tasks to run longer, the potential that the task will successfully end is increased, thereby yielding a more efficient overall system. In the preferred embodiment, the extensions are iteratively computed as a fixed percentage of the cost of each task until reaching an amount of time where the system is no longer feasible. The extension values resulting from the iteration before the cost-extended system becomes infeasible are then used at run-time when a particular task encounters an overrun condition. This technique is advantageous in systems where execution of non-schedulable entities (such as occurrence of hardware interrupts) occurs during execution of one or mor
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 18 · Forward citations: 21.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A computer program product for improving scheduling of tasks, the computer program product embodied on one or more computer readable media for execution on a computer and comprising: computer-readable program code for computing whether execution of a plurality of schedulable tasks is feasible, wherein each of the tasks has an associated cost and an associated deadline; computer-readable program code for computing a task-specific maximum cost extension allowable for a subsequent execution of each task, wherein the maximum cost extensions for all the tasks, when taken together, allow the executi