Method of accurate trenchless installation of underground pipe
Abstract
A method for the trenchless installation of new underground pipe accurately on line and on grade by microtunneling to install a pilot tube, installing a drill string along the pilot pipe line using a directional drilling machine, installing a back reamer to the drill string and using a directional drilling machine to pull back the reamer and install a product pipe behind the reamer. A pilot tube is installed on line and on grade by utilizing the guidance system of a microtunneling apparatus to install a pilot tubes between jacking and target shafts. A drill string is installed to displace the pilot tubes and a back reamer is attached to the drill string with a product pipe attached to the reamer. The reamer may be pulled using any suitable pulling device such as a directional drilling machine.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 28 · Forward citations: 9.
Claims (2 — 2 Independent, 0 Dependent)
- Claim 1Independent Claim
A process for the trenchless installation of an underground product pipe from a first location to a second location at a predetermined depth, comprising: digging a first access shaft at the first location and a target access shaft at the second location to the predetermined depth; installing a pipe displacement machine in the first access shaft; jacking a steerable pilot tube and additional pilot tube sections into the ground from the first access shaft to the target shaft displacing the soil to form a pilot pipe from the first access shaft to the target shaft; installing a drill string to rep
- Claim 2Independent Claim
The proces