System and method for priority-based work order scheduling
Abstract
A priority-based work order scheduling system includes a graphical user interface having displays for managing work orders stored in the system. Work orders are entered into the system via a work order entry computer. A time estimate for completing the work order is determined. Work order data associated with the work order is stored along with the time estimate to complete the work order in a database management system. A priority is assigned to the work order and stored in the database management system. Operationally, the scheduling system is used during scheduling meeting to assist in making scheduling determinations, and for updating work order data stored in the database management system. Work order data can be updated by engineers having authority to perform the updates outside of a scheduling meeting.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 10 · Forward citations: 50.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A system for managing work orders using priorities, comprising: a work-order entry computer for entering a plurality of work-orders; a database management system coupled to the work-order entry computer for storing work-order information related to the plurality of work orders; a work order management computer; a time estimation process executing on the work order management computer for assigning a time estimate to each work order entered, the time estimate corresponding to the time estimated to be required to complete the work order; a priority assigning process executing on the work order m
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗