Patents
US 6,923,871 B2#6492761 Most CitedExpiredUnited States (USPTO)Utility

Coiled tubing wellbore cleanout

15Forward Citations (#6492761 Global)
0.7/yrCitation Velocity (#10679820 Global)
1.89Citation PageRank (#15962448 Global)
32Prior Art Cited
3Claims (2 Indep. · 1 Dep.)
0Drawings / Sheets

Abstract

Method and apparatus for substantially cleaning fill from a borehole, variously including in preferred embodiments disturbing particulate solids of fill while RIH, entraining particulates while POOH, jetting downhole while RIH and jetting uphole while POOH, and controlling at least one of a pump rate regime or a POOH rate regime.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 32 · Forward citations: 15.

Claims (3 — 2 Independent, 1 Dependent)

  1. Claim 1Independent Claim

    A method of removing fill from a wellbore comprising running a coiled tubing having an end into the wellbore; circulating a cleaning fluid through the coiled tubing to create a slurry of cleaning fluid and particulate solids of the fill; pulling the coiled tubing out of the hole at a pulling out of hole (POOH) speed sufficient to substantially remove the particulate solids from the wellbore while circulating the cleaning fluid at a flow rate that is less than a higher flow rare required to maintain the particulate solids in continuous suspension in the slurry in the wellbore and re-entraining

  2. Claim 2Depends on #1

    The method of claim 1 wherein the POOH speed is determined by computer modeling.

  3. Claim 3Independent Claim

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Non-Patent Literature (5)

  • A.A. Gavignet, et al., SPE 15417 "A Model for the Transport of Cuttings in Highly Deviated Wells"; (C) 1986.
  • Alain A. Gavignet, et al., "Model Aids Cuttings Transport Prediction"; (C) 1989 Society of Petroleum Engineers; JPT Sep. 1989, p. 916-921.
  • Alexander Sas-Jaworsky II, "Coiled Tubing. . . Operations and Services", Part 4; pp. 28-33; (1992).
  • BJ Services Company, "Fill Removal", Chapter 4. Jan. 5, 2002.
  • Brown, N.P., Bern, P.A., and Weaver, A., "Cleaning Deviated Holes: New Experimental and Theoretical Studies," SPE/IADC 18636, IADC/SPE Drilling Conference, New Orleans, Feb. 1989.