Patents
US 6,922,649 B2#5815018 Most CitedExpiredUnited States (USPTO)Utility

Multiple on-chip test runs and repairs for memories

16Forward Citations (#5815018 Global)
0.8/yrCitation Velocity (#9796551 Global)
2.70Citation PageRank (#8981673 Global)
21Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A structure and method for performing on-chip test runs and repairs of a memory chip. In the first test run and repair, a BIST circuit obtains the original combined repair solution from a fuse bay on the memory chip, runs the first test run for the memory chip, obtains a first test-run repair solution, and combines the original combined repair solution and the first test-run repair solution to obtain the latest/first combined repair solution. Then, an exclusive-OR gate is used to compare the first combined repair solution and the original combined repair solution to obtain a first new repair solution, which is programmed into the fuses of the fuse bay. As a result, the fuse bay stores the first combined repair solution. In the second test run and repair, a similar process is performed, and so on. As a result, any number of test runs and repairs can be performed on-chip for the memory chip.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 21 · Forward citations: 16.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A structure, comprising: a fuse bay including a fuse array of N fuses, N being an integer; a built-in-self-test (BIST) circuit electrically coupled to the fuse bay; a memory module electrically coupled to the fuse bay and the BIST circuit; and a new repair circuit electrically coupled to the fuse bay and the BIST circuit, wherein the fuse bay is configured to store and shift an original combined repair solution to the BIST circuit; the BIST circuit is configured to (i) perform a first test run on the memory module so as to obtain a first test-run repair solution, and then (ii) combine the firs

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (21)

Non-Patent Literature (5)

  • Barth et al., Method to Reduce Chip Yield Loss Due to Fuses Incorrectly Blown, Research Disclosure, May 1990, No. 313, 1 page.
  • Cowan et al., On-Chip Repair and an ATE Independent Fusing Methodology, 2002 IEEE, ITC International Test Conference, pp. 178-186.
  • IBM Technical Disclosure Bulletin R. J. Prilik, vol. 30, No. 11, Apr. 1988, Repair Calculation for Random-Access Memory Redundancy Using Built-in Logic and Scannable Latches, pp. 424-425.
  • Schober et al., Memory Built-In Self-Repair Using Redundant Words, 2001 IEEE, ITC International Test Conference, pp. 995-1001.
  • Tanabe et al., A 30-ns 64-Mb DRAM With Built-In Self-Test and Self-Repair Function, Nov. 1992, IEEE Journal of Solid-State Circuits, vol. 27, No. 11, pp. 1525-1533.