Coal and rock cutting pick
Abstract
The pick ( 1 ) includes a radially inner end ( 4 ) and a shank ( 3 ) to be fixed to the drum ( 10 ) to substantially prevent relative movement between the pick ( 1 ) and drum ( 10 ). The pick ( 1 ) further includes a cutting head ( 2 ) having leading ( 5 ) and trailing faces ( 6 ) intersecting to provide a cutting edge ( 8 ) to extend generally parallel to an axis. The leading face ( 5 ) in use is inclined by an acute rake angle R to a radius of the axis, with the trailing face ( 6 ) being inclined at an acute back clearance angle B to a plane passing through the edge ( 8 ) and normal to the radius. The leading face ( 5 ) and trailing face ( 6 ) being inclined by an acute angle and the shanks when fixed to the drum ( 10 ) extends at an acute angle to the radius.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 12 · Forward citations: 8.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A pick assembly for mounting on a rotatable drum, said drum having a longitudinal axis of rotation, said pick assembly comprising a pick holder and a pick having a longitudinal axis, said pick having: a non rotating cutting head having a straight cutting edge which delimits substantially planar front and trailing faces of said head; a securing end engaged within said pick holder to secure said pick relative to said drum so that in use, rotation of said drum drives said cutting edge forward in a generally circular path and so that said pick is prevented from moving substantially relative to sai
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (8 of 8 total)
References Cited — Backward Prior Art (12)
Non-Patent Literature (1)
- Dawood, A. D., "The Design of Coal and Rock Cutting Systems With Particular Reference to Debris Size Distribution", The University of New South Wales School of Mining Engineering, Faculty of Applied Science, vols. I and II, Oct. 1984, pp. 1-429 and Appendices.