Method of uprating an existing nuclear power plant

28Forward Citations (#2583420 Global)
1.3/yrCitation Velocity (#4231961 Global)
2.94Citation PageRank (#7814857 Global)
16Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

An improved method of increasing the power output of an existing nuclear power plant includes increasing the thermal power output of the plant's nuclear island and constructing of an auxiliary BOP to handle the increased thermal power. The thermal power of the nuclear island can be increased such as by increasing the thermal power of the plant's reactor, by replacing the plant's steam generator with one that is more efficient, and by increasing the flow rate and/or change in temperature of a coolant in a secondary cooling loop of the plant. The thermal power of the reactor can be increased such as by replacing existing cylindrical fuel rods with fuel rods having a relatively greater surface area to volume ratio and/or by increasing the flow rate and/or the change in temperature of a coolant of a primary cooling loop. The auxiliary BOP can be constructed while the plant is in operation, and can then be connected with the nuclear island during a maintenance operation on the reactor.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 16 · Forward citations: 28.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method of increasing the electrical power output of an existing nuclear power plant, the plant including a nuclear island and a balance of plant connected together, the nuclear island including a containment having an interior, a pressurized water reactor having a number of fuel rods that include fissile material, and a steam generator, the reactor and the steam generator being disposed within the interior of the containment, the containment outputting thermal power, and the balance of plant outputting electrical power, the method comprising: operating the nuclear island during a first time

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (15 of 28 total)

Non-Patent Literature (4)

  • "Analysis of Proposed TS Change Regarding Increase of License Thermal Power" online available: http://adamswebsearch.nrc.gov/scripts/rwisapi.dll/@pip.env?CQ_session_key=mwjpd . . . Nov. 2002.
  • "Press Release-02-051: NRC Approves Power Uprate for South Texas Projec 1 & 2", online, available : http://adamswebsearch.nrc.gov/scripts/rwisapi.dll/@pip.env?CQ_session_key=mwjpd . . . Apr. 22, 2002.
  • Apostolakis, "GE Nuclear Energy Licensing Topical Report, NEDC-33004P, 'Constant Pres Power Uprate' (Revision L)" online available : http://adamswebsearch.nrc.gov/scripts/rwisapi.dll/@pip.env?CQ_session_key=mwjpd . . . Apr. 17, 2002.
  • Nuclear Engineering Int., "Improving LWR Fuel Utilization", pp 13, 14, Feb. 1979.