Method for identification and removal of non-timing critical wire routes from congestion region
Abstract
A method for identifying and modifying, in a VLSI chip design, wire routes within a region of wiring congestion that can be routed around that region without inducing timing violations by the insertion and proper placement of inverters. Circuits and nets are examined in the vicinity of the wiring congestion to determine those nets with high potential to drive a route outside the region. Circuit locations are analyzed to determine if the net connecting them creates a path through the region of wiring congestion. Timing slacks are derived from the timing reports for such nets and compared against a timing value representing the additional delay of using an inverter pair to drive the wire route outside the region of wiring congestion. If a net has sufficient timing slack, it is buffered with an inverter pair which is then placed in a manner as to force the wire routes for the modified path around the region of wiring congestion, thereby reducing the wire utilization within the region.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 4 · Forward citations: 13.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
A method for identifying, in a VLSI chip design, wire routes within a region of wiring congestion that have the necessary drive strength and net topology to be routed around that region, comprising the steps of (a) identifying all the circuits placed within the congestion region and filtering out all but the inverters and buffers with high drive strength; and (b) identifying nets connected to said circuits which have a single sink of high drive strength; and after determining identified nets which have adequate timing slack to be buffered and routed around the region of congestion, subsequentl
- Claim 2Depends on #1
The method as in claim 1 , in which step (a) comprises determining those ci
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗