Method of mixed workload high performance scheduling
Abstract
A method of scheduling in a mixed workload environment. A high priority workload requiring bounded response times is executed on the same system with a low priority workload that is capable of tying up the CPU and multiple volume storage resources of the system by causing multiple concurrent I/O operations, thereby increasing the response times of the high priority workload beyond acceptable bounds. The method of scheduling prevents the response times of the high priority workload from increasing beyond the acceptable bounds by deferring the dispatch of processes servicing the current low priority workload for a time that depends on the priority of the low priority work and by not performing concurrent I/O operations that are requested by the current low priority work, when there is sufficient higher priority activity on the storage resource.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 7 · Forward citations: 36.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method of scheduling in a mixed workload environment on a computing system having a CPU resource and a permanent storage resource, the computing system servicing requests from one or more clients, comprising: executing a current process on the CPU resource and the storage resource, the current process having been dispatched to service a current client request; performing a contention check while executing the current process to determine whether a new client request has a transaction priority that is greater than the transaction priority of the current client request; if the transaction prio
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗