Patents
US 6,885,902 B2#1547698 Most CitedExpiredUnited States (USPTO)Utility

System and method for replenishment by purchase with attribute based planning

38Forward Citations (#1547698 Global)
1.8/yrCitation Velocity (#2500300 Global)
4.05Citation PageRank (#4661644 Global)
8Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A system and method for determining whether a supply chain network resource may be replenished by purchase in order to meet demand as defined by an order. The system and method is an attribute-based system and method that may be part of an overall system and method for planning the use of supply chain network resources. The system and method may generate a planning output that may indicate the feasibility of replenishment by purchase. The system and method recognizes time events and takes into account the exact sequence of the events in order to obtain an optimal solution.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 8 · Forward citations: 38.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method for planning the replenishment of a supply chain network resource by purchase in order to fulfill demand as defined by an order, wherein said order defining a stock keeping unit with attribute, comprising the steps: determining time items, wherein said time items are specific points in time or time periods relating to said order and wherein at least one of said items is a purchase lead time based on said stock keeping unit with attribute, and wherein said time items further comprising a purchase order placement date, a replenish start date, a replenish need date, a maximum lateness, a

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Non-Patent Literature (1)

  • International Search Report dated May 21, 2003, for Application No. PCT/US02/41573.