Method and apparatus for adjusting receiver voltage threshold and phase sampling point using FEC counts
Abstract
Methods and apparatus are provided for adjusting slicing parameters, such as a voltage threshold and a phase sampling point, used in recovering 1's and 0's from a signal so as to reduce a bit error rate (BER) of the signal. The BER is modelled as a second order polynomial of the slicing parameters. The BER is repeatedly determined from a Forward Error Correction corrected bits counter. For each BER measurement the model is updated, using for example a recursive least squares fit. New values of the slicing parameters are then determined by carrying out an iteration of an optimization, such as a Levenberg-Marquardt optimization, using the model. The new values of the slicing parameters are passed to a Clock and Data Recovery module. Various conditions are checked before updating the model or determining the new values of the slicing parameters, such as changes in signal power or high BERs which exceed the error correction capabilities of the forward error correction.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 13 · Forward citations: 37.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
A method of determining a value of each of at least one slicing parameter for use in recovering bits in a received signal in a communication system so as to reduce a bit error rate (BER) of the received signal, the received signal having a bit rate and a signal power, the method comprising the steps of: generating a second order polynomial model of the BER as a function of the at least one slicing parameter; initializing each slicing parameter to a respective initial value; repeatedly measuring the BER of the received signal from a Forward Error Correction (FEC) corrected bits counter; and for
- Claim 2Depends on #1
The method of claim 1 wherein the step of adjusting the at least one slicing parameter comprises the steps of: determining whether th
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗