Patents
US 6,858,074 B2#436969 Most CitedExpiredUnited States (USPTO)Utility

High early-strength cementitious composition

74Forward Citations (#436969 Global)
3.5/yrCitation Velocity (#623052 Global)
13.74Citation PageRank (#625745 Global)
44Prior Art Cited
3Claims (1 Indep. · 2 Dep.)
0Drawings / Sheets

Abstract

A high early-strength cementitious composition comprising a hydraulic cement; and a combination admixture system wherein the combination admixture system comprises a polycarboxylate high range water reducing dispersant in combination with an accelerator and a retarder. The admixture allows for acceptable workability and development of high early-strength in cementitious compositions without the use of an external heat source.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 44 · Forward citations: 74.

Claims (3 — 1 Independent, 2 Dependent)

  1. Claim 1Independent Claim

    A composition of admixtures for cementitious compositions comprising: a) a polycarboxylate high range water reducing dispersant; b) an accelerator; and c) a retarder; which in combination provides the cementitious compositions with flexural strength of at least 400 pounds per square inch and compressive strength of at least 2,200 pounds per square inch within 4 hours after placement.

  2. Claim 2Depends on #1

    The composition of claim 1 wherein the composition of admixtures is chloride-free.

  3. Claim 3Depends on #1

    The composition of claim 1 , wherein the accelerator comprises at least one of: a) a nitrate salt of an alkali metal, alkaline earth metal, or aluminum; b) a nitrite salt of an alkali metal, alkaline earth metal, or aluminum; c) a thiocyanate of an alkali metal, alkaline earth metal or aluminum; d) an alkanolamine; e) a thiosulphate of an alkali

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (15 of 74 total)

Non-Patent Literature (5)

  • ACI Committee 325 Technical Document 325-11R-01 "Accelerated Techniques for Concrete Paving", no date available.
  • Ed Rice, Four vs. Two Hours, Feb. 2002, Concrete Construction.
  • Jim Anderson, "Paving Repair Finds a Four-Hour Champion" Dec. 2001 Concrete Construction.
  • Tom Pyle, "Fast-Setting Concrete Evaluated in California" Apr. 2002 Better Roads.
  • Tom Pyle, Robert S. Sugar, Abstract-"Rapid Strength Portland Cement Concrete" California Department of Transportation, Materials Engineering and Testing Services, Caltrans/Paving Association, Concrete Paving Conference, Dec. 2001.