Method for providing distributed material management and flow control in an integrated circuit factory
Abstract
A method for providing distributed material management and flow control in an integrated circuit (IC) factory. The IC factory comprises a factory stocker, a plurality of process bays and a factory transport agent for moving wafer cassettes between the bay and the stocker. Each of the bays comprises a bay stocker, a plurality of tools, a mini-stocker and a bay transport agent for moving wafers amongst the bay components. The apparatus uses partitioned stockers to facilitate deadlock avoidance or deadlock resolution. Additionally, various algorithms are used to detect wafer cassette movement situations where deadlocks may result from a wafer cassette movement within a bay and for resolving deadlocks when they occur.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 9 · Forward citations: 18.
Claims (3 — 1 Independent, 2 Dependent)
- Claim 1Independent Claim
A method of moving wafer cassettes in an integrated-circuit factory comprising a plurality of possible cassette placement locations comprising: generating a bid from at least one cassette placement location in a plurality of cassette placement locations, where each bid contains a request for a wafer cassette; transmitting the bids to a central computer; comparing bids from a plurality of cassette placement locations; assigning wafer cassettes to cassette placement locations in response to said bid comparison; and moving the wafer cassettes to the cassette placement locations in accordance with
- Claim 2Depends on #1
The method of claim 1 wherein said cassette placement locations are tools for processing wafers.
- Claim 3Depends on #1
The method of claim 1 wherein said cassette placement locations are stockers for storing wafer cassettes.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 18 total)
References Cited — Backward Prior Art (9)
Non-Patent Literature (3)
- Copy of Communication Relating to the Results of the Partial International Search for corresponding PCT/US02/19856, dated Nov. 6, 2003.
- Ramaswamy, et al., "Deadlock-Free Schedules for Automated Manufacturing Workstations," IEEE Trans. Robotics and Automation, 12(3), Jun. 1996, 391-400.
- Reveliotis, et al., "Deadlock Avoidance Policies for Automated Manufacturing Cells," IEEE Trans. Robotics and Automation, 12(6), Dec. 1996, 845-857.