Wireless downwhole measurement and control for optimizing gas lift well and field performance
Abstract
A method for optimizing the production of a petroleum well is provided. The petroleum well includes a borehole, a piping structure positioned within the borehole, and a tubing string positioned within the borehole for conveying a production fluid. Production of the well is optimized by determining a flow rate of the production fluid within the tubing string and determining a lift-gas injection rate for the gas being injected into the tubing string. The flow rate and injection rate data is communicated along the piping structure of the well to a selected location, where the data is collected and analyzed. After analysis of the data, an optimum operating point for the well can be determined.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 58.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for optimizing the production of fluid in a petroleum well having a borehole and a piping structure positioned within the borehole, comprising the steps of: determining a flow rate of the production fluid downhole in the borehole using a sensor positioned downhole in the borehole and powered using an AC signal applied to the piping structure as a conductor; determining a lift-gas injection rate for an amount of lift-gas being injected into the well; communicating the flow rate data and the lift-gas injection rate data; and collecting and analyzing the flow rate data and the lift-gas i
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 58 total)
References Cited — Backward Prior Art (50)
Non-Patent Literature (4)
- Brown. Connolizo and Robertson, West Texas Oil Lifting Short Course and H.W. Winkler, "Misunderstood or overlooked Gas-Lift Design and Equipment Considerations," SPE, p. 351 (1994).
- Der Spek, Alex, and Aliz Thomas, "Neural-Net Indentification of Flow Regime with Band Spectra of Flow-Generated Sound", SPE Reservoir Eva. & Eng.2 (6) Dec. 1999, pp. 489-498.
- Otis Engineering, Aug. 1980, "Heavy Crude Lift System", Field Development Report, OEC 5228, Otis Corp., Dallas, Texas, 1980.
- Sakata et al., "Performance Analysis of Long Distance Transmitting of Magnetic Signal of Cylindrical Steel Rod", IEEE Translation Journal on magnetics in Japan, vol. 8, No. 2. Feb. 1993,, pps. 102-106.